GovBidReport

GovBidReportby tradeConstruction of Buildings → Virginia

Construction of Buildings contracts in Virginia

14 open federal solicitations in construction of buildings (NAICS 236) to be performed in Virginia — 14 reserved for small businesses. From SAM.gov, updated daily.

Install Back Up Generator and Ats for Nmci Room, It Server Racks and Hvac in Room S145 of B127 Taylor Hall, Nas Oceana, Dam Neck AnnexDept of Defense · due 2026-09-08 · Small businessInstall Back Up Generator and Ats for Nmci Room, Bldg 127, Dam Neck AnnexDept of Defense · due 2026-09-08 · Small businessInstall Back Up Generator and Ats for Nmci Room, Bldg 127, Dam Neck AnnexDept of Defense · due 2026-09-08 · Small businessFort Lee Vehicle Recovery RangeDept of Defense · due 2026-09-29 · 8(a)CSS#89463 - Renovate and Repaint Interior USARC - Charlottesville, VADept of Defense · due 2026-08-31 · Small businessCeiling Tile ReplacementDept of Defense · due 2026-08-31 · WOSBSP-91 Secure Rooms 119B and 119CDept of Defense · due 2026-09-01 · 8(a)Fort Lee Vehicle Recovery RangeDept of Defense · due 2026-09-01 · 8(a)SP-91 Secure Rooms 119B and 119CDept of Defense · due 2026-09-01 · 8(a)SP-91 Secure Rooms 119B and 119CDept of Defense · due 2026-09-01 · 8(a)RHS HVAC Replacement ERVD172002Dept of Defense · due 2026-09-01 · SDVOSBRHS HVAC Replacement ERVD172002Dept of Defense · due 2026-09-01 · SDVOSB

All 14 — filter to your certifications →

Also see: all 750 open construction of buildings contracts (most federal work is location-flexible and open to Virginia firms).

Per solicitation · $99

Know every requirement before you bid

Open any solicitation above for the complete compliance breakdown — every required document, pass/fail requirement, and non-responsive trigger, read from all the official documents.

This report compiles and structures publicly posted government solicitation information from official procurement sources. It is not legal advice, is not affiliated with or endorsed by any government agency, and does not replace reading the full official solicitation and its amendments. Requirements, evaluation criteria, and deadlines are current as of the source posting — always confirm against the official solicitation and any addenda before you submit. Being responsive is your responsibility; verify every mandatory item in the official document.